Basement Finishing

Rippy Remodeling specializes in custom basement finishing in Castle Rock and surrounding Douglas County communities. From framing and egress to electrical, drywall and finish carpentry, we build comfortable, functional spaces including wet bars, guest suites, bathrooms and more.

Turn Your Unfinished Basement Into Space You'll Actually Use

Family Rooms

Comfortable gathering spaces designed for movie nights, game days and everyday family life.

Guest Suites

Comfortable private spaces that five family and guests a place of their own.

Bathrooms / Laundry Rooms

Basements can create unique challenges when accommodating the various needs of each individual family. Whether it's a bathroom with a laundry or a bath shower combination, we are confident the end result will not only be beautiful, but functional as well.

The Rippy Difference: Comprehensive planning and communication.

Before any work begins we map out a plan for your basement, starting with detailed estimates and plans to insure the final product matches your needs and expectations. Basement finishes can have a wide variety of costs, which is why initial planning and communication are so important.

The 10 Step Process

We break down the process for finishing basements into 10 steps to easily understand where we are in the process and what comes next.

Step 1: Planning and Budget

The truth is, one can build a budget that can vary significantly depending on the items you wish to include in that budget. We provide line item estimates so you can see exactly why the budget is priced according to the items you select. Whether you want to buy your own fixtures and have us install them or you want to leave everything in our capable hands, you get to see in real time how that affects the overall cost.

We believe the planning process to be crucial to projects running efficiently, which is why we take great care in our approach to selecting fixtures, doors, etc. that will not only fit your budget, but fit our plans as well. We create plans according to budget, purpose and permits to insure the project finishes on time and on budget.

Our Estimates Are ALWAYS FREE!

brown pencil on white printing paper
brown pencil on white printing paper

Step 2: Permitting Process

All basement finishes in Colorado need a permit and need to adhere to codes for the jurisdiction they are in. We have over 10 years experience creating and implementing code compliant plans.

What to expect: turnaround times vary from jurisdiction to jurisdiction but one can typically expect a week turnaround time once plans are submitted. On the extremely rare occasion that a plan needs altered before they are approved for implementation, customers can expect 10 business days from completion of plans to permit approval. Cost for permitting includes designing of plans as well as permitting fees from the jurisdiction and are a flat fee of $2500.

While plans are awaiting approval, we like to do a small amount of preparation, such as snapping lines for walls so that framing can begin immediately upon receiving permit approval.

Step 3: Framing

We are extremely diligent about starting our framing as soon as we receive permit. Once permits are placed in your front window, we begin to put up your walls. Most framed walls in Colorado basements are required to be floating because they are placed on top of concrete slabs designed to move up and down due to the expansive soils we have in Colorado.

Framing typically takes 5-10 business days from start to finish depending on complexity of things like soffits, windows etc.

Step 4: Rough-In & Insulation

Over the years we have refined our list of plumbers, electricians and HVAC technicians we partner with to highly reliable individuals and companies. Our subcontracted tradesmen work efficiently to ensure our projects stay on schedule.

While each project is unique, typically customers can expect rough-in to take 5 to 10 business days. We typically go from large to small inside of the ceilings and stud bays to help the project run efficiently. That means the order of operations is HVAC, Plumbing and then electrical.

Once the subcontractors have finished their work, fire blocking and insulation can begin. The process of insulating your basement is going to be different from one client to another; some clients prefer to insulate their ceilings with sound barriers, others just want the bare minimum. In either case, insulation typically takes 2 to 5 business days to complete.

Upon completion of insulation, rough-in inspection can be called in and once inspection has been passed, drywall can begin.

Step 5: Drywall

Before drywall begins, furnaces, vents and doorways are completely masked off to prevent drywall dust from entering the home. Upon stamped approval of the rough-in inspection, drywall will begin.

Timeframe for completion of drywall will vary from one jurisdiction to another because some jurisdictions require fastener inspection, while others do not. This inspection typically adds 1 to 3 days to the overall process because drywall crews need to completely halt the process to allow for inspection.

Once fastener inspection is completed, drywall crews will then tape and mud all surfaces. Upon completion of taping and mud, texture crew will then complete the requested texture and allow one day to dry. As soon as texture has dried, it will be sanded and primed for paint.

Drywall typically takes 5-10 business days from start to finish.

Step 6: Doors

Nobody wants a sticky door! We really pride ourselves on installing doors that operate exactly as they should. Believe it or not, not all doors are created equal. With our extensive experience, we can guide you on selecting doors that meet your needs.

Budget friendly hollow core doors from big box stores often come with frames that are not completely square and can often be warped. If budget is your top priority, we have the experience to be able to mitigate these issues so that most homeowners would never know upon completion of the project. However, if quality is higher on your priority, we have the experience to provide higher grade doors and frames to ensure your expectations are met.

Once doors are installed and checked to ensure functionality, we can begin installing casing. Depending upon what flooring option is chosen, we will install baseboards at this time or wait until flooring is completed before installing baseboards.

Step 7: Painting

We have a large variety of painting subcontractors we use for the completion of your project. We also know that painting is an area where many homeowners choose to save money by completing the painting portions on their own. We are very flexible and understand if this is an area and open to whatever process you choose!

The painting portion of your project is also a time to explore adding any extras you may be interested in. Sometimes the budget can allow for things like a play house for your kids in the unused space below your stairs, a custom built in for clothes or maybe an accent wall in the bedroom. Whatever your needs, we have the skill and ability to complete most any creative design.

Step 8: Flooring & Tile

Flooring in your basement is generally not as straightforward as one might believe. Did you know there is no inspection from your local jurisdiction to ensure your flooring was installed correctly? That is why it is imperative that you work alongside a contractor that knows exactly what they are installing and how to properly install to ensure longevity.

Dealing with concrete slabs that move due to expansive soils has its complications. Our years of experience can help you make decisions regarding LVP, Laminate, Engineered Wood, Tile, Carpet etc. so you can enjoy your living space for years to come.

Step 8 is also typically the same time we install any tile (If necessary) and get your shower or bath area ready for fixtures. If you want to learn more about our bathroom additions/remodels, please visit our Bathroom Remodeling page.

Step 9: Fixtures & Finishes

The home stretch as far as your basement is considered. Step 9 is where bathroom faucets, toilets, vanities are installed along with doorknobs, door stops and closet shelves. All the final preparations are made for final inspection.

Step 10: Final Inspection

Your basement is finished, the walls are up, the fixtures are in, there's nothing left to do except move in. This is when the final inspection is performed. Your jurisdiction's inspector will check various things like, means of egress, faucet operation, outlet power, light switch functionality etc. Upon completion of the final inspection, you can move in and start enjoying your brand new basement!

All basement projects will vary to some degree, but most all basements completed by Rippy Remodeling have a completion time between 6 and 8 weeks!

Ready to Expand Your Living Space?

Schedule an on-site basement measurement and structural feasibility review. We'll discuss your vision and provide a detailed plan for your conversion.